Construction Project Handover Checklist

A thorough handover process is crucial to ensure that all aspects of a construction project are complete, documented, and ready for the client. This checklist covers the essential steps to prepare for a smooth handover of any construction project.

Construction Project Handover Checklist
Construction Project Handover Checklist

A thorough handover process is crucial to ensure that all aspects of a construction project are complete, documented, and ready for the client. This checklist covers the essential steps to prepare for a smooth handover of any construction project.



1. Complete Physical Inspections

Ensure that all work has been completed as per the project specifications and drawings. Inspect every area to verify that construction is finished to standard.



2. Conduct Quality Assurance Checks

Carry out final quality checks to ensure all materials, finishes, and installations meet quality requirements and project specifications.



3. Finalize Punch List Items

Review the punch list and ensure all remaining tasks, minor fixes, and incomplete work have been resolved and signed off.



4. Verify Compliance Documentation

Confirm all compliance-related documentation, including safety, environmental, and structural certifications, is complete and meets local regulatory requirements.



5. Review As-Built Drawings

Provide the client with final as-built drawings that reflect any deviations or adjustments made from the original plans during construction.



6. Ensure System Testing and Commissioning

Verify that all systems (HVAC, electrical, plumbing, etc.) have been tested, commissioned, and are functioning according to design specifications.



7. Complete Equipment and System Manuals

Compile manuals for all equipment and systems installed on-site. Include manufacturer instructions, warranties, maintenance requirements, and contact information for service support.



8. Conduct Health and Safety Check

Ensure all health and safety hazards have been addressed and confirm that the site is safe for handover, including clear signage, secure fixtures, and hazard-free walkways.



9. Perform Final Client Walkthrough

Arrange a walkthrough with the client to review completed work, explain functionality, and address any final questions or concerns.



10. Review Financials and Final Payments

Ensure all payments, including retentions, are processed. Confirm any outstanding financial obligations and prepare final invoices.



11. Transfer Warranties and Guarantees

Compile and hand over all relevant warranties and guarantees related to materials, workmanship, and equipment.



12. Finalize Maintenance Schedules

Provide a maintenance schedule for all key systems and components, including recommendations for ongoing maintenance and service providers.



13. Confirm Handover of Keys and Access

Provide the client with all keys, access codes, and security passcards for the site and ensure they understand any access procedures.



14. Compile Handover Documentation

Create a comprehensive handover package with all relevant documentation, including drawings, permits, warranties, inspection reports, and certificates.



15. Obtain Client Sign-Off

Get formal client sign-off on the completed project, confirming that all handover requirements have been met to their satisfaction.