Ultimate Project Go Live Question Checklist

Writer's picture: Michelle MMichelle M

The go-live phase of a project is a crucial milestone that requires meticulous planning and preparation to ensure a smooth transition from development to operational use. A comprehensive go-live checklist is essential to mitigate risks and ensure all critical aspects are covered. Here are some key questions to include in your project go-live checklist.

Project Go No Go Live Checklist
Ultimate Project Go Live Question Checklist



1. Have All Objectives Been Met?

  • Have all project deliverables been completed and approved?

  • Are the project goals and success criteria fully achieved?

  • Has the project scope been thoroughly reviewed to ensure nothing is missing?

Ensuring that all objectives are met confirms that the project is ready for deployment and aligns with the initial requirements.


2. Is the System Fully Tested?

  • Have all testing phases (unit, integration, system, user acceptance) been completed successfully?

  • Are all critical bugs and issues resolved?

  • Has performance testing been conducted to ensure the system can handle expected loads?

Thorough testing is vital to ensure the system functions correctly and meets performance standards.


3. Are Training and Documentation Complete?

  • Have end-users been adequately trained on the new system?

  • Is all user documentation and training material available and accessible?

  • Have support teams been trained to handle potential issues?

Proper training and documentation are crucial for user adoption and smooth operation post go-live.


4. Is the Infrastructure Ready?

  • Is the hardware and software environment ready and configured?

  • Have backups and disaster recovery plans been implemented and tested?

  • Are all necessary licenses and permissions in place?

A ready infrastructure ensures that the system can be deployed without any technical hurdles.


5. Are Data Migration and Integrity Ensured?

  • Has all necessary data been migrated to the new system?

  • Have data integrity and accuracy been verified post-migration?

  • Is there a plan in place for handling any data migration issues?

Ensuring data integrity is critical to maintaining business continuity and accuracy in operations.


6. Is the Rollout Plan Finalized?

  • Is there a detailed rollout plan that includes timelines and milestones?

  • Are there contingency plans for potential issues during the rollout?

  • Have all stakeholders been informed about the rollout schedule?

A clear rollout plan helps in coordinating efforts and managing expectations.


7. Have Stakeholders Signed Off?

  • Have all key stakeholders reviewed and approved the go-live decision?

  • Is there documented sign-off from project sponsors and key users?

  • Are there any unresolved concerns from stakeholders?

Stakeholder approval is crucial for ensuring consensus and support for the go-live decision.


8. Is the Support Structure in Place?

  • Are support teams ready to handle any post-go-live issues?

  • Is there a clear escalation path for critical issues?

  • Are service level agreements (SLAs) defined and communicated?

A robust support structure ensures that any issues post go-live are promptly addressed.


9. Have All Risks Been Mitigated?

  • Have all identified risks been addressed and mitigated?

  • Is there a risk management plan in place for post-go-live?

  • Are there monitoring tools in place to detect any issues early?

Risk mitigation is essential to prevent potential problems from derailing the go-live process.


10. Is There a Communication Plan?

  • Is there a communication plan to inform all relevant parties about the go-live?

  • Are end-users aware of any expected downtime or changes?

  • Is there a plan for ongoing communication post go-live?

Effective communication ensures that everyone is informed and prepared for the go-live event.


Conclusion - Ultimate Project Go Live Question Checklist

Ultimate Project Go Live Question Checklist. A thorough go-live checklist is vital to ensure a successful transition from project completion to operational use. By addressing these key questions, you can mitigate risks, ensure readiness, and set the stage for a smooth and successful go-live.